Question 146
Utilization can be determined from:
Question 147
What consist of a series of operations required to make the item?
Question 148
If the efficiency of the work center in the above question is 115%. What is the rated capacity of the work center?
Question 149
The operation that controls the work feeding the bottleneck and must operate at a rate equal to the utput of the bottleneck so the time buffer queue is maintained is known as:
Question 150
Knowing the quantity beyond which the cost of using method B becomes less than for method A enables us to decide easily which process to use to minimize the total cost, this quantity is called: