Free BCS TM12 Exam Dumps Questions & Answers
| Exam Code/Number: | TM12Join the discussion |
| Exam Name: | ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) |
| Certification: | BCS |
| Free Question Number: | 65 |
| Publish Date: | Aug 18, 2026 |
| # of views: | 2831 |
|
|
|
Which of the following statements about management of product quality risks in mature organizations with respect to the lifecycle, is true?
Number of correct responses: 1
For which of the following activities would the costs be classified as a cost of detection?
Number of correct responses: 1
Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testing:
-for each 10000 LOC (lines of code), 200 defects
-for each person-month of development team effort, 49 defects
You want to use this information to perform estimation for a new project.
The project manager tells you that he/she has estimated 20000 new LOC for this new project.
Four developers work for four months on this project before system testing.
During system testing, 797 defects are discovered.
Assume that the system test of this new project is using the same amount of work as spent in the past projects.
Based on this information only, which of the following statement is certainly true about this project?
Number of correct responses: 1
You are performing a quality risk analysis for a CSCI (Computer Software Configuration Item) used to implement a
CBIT (Continuous Built-In Test) module of a safety-critical system.
During the quality risk analysis you are trying to identify the ways in which failures of the CBIT module can occur, for each of them trying to determine the potential causes and likely effects, and the risk level (calculated as the product of three factors: severity, occurrence and detection).
Which of the following risk analysis techniques are you working with?
Number of correct responses: 1
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.
The requirements specification document contains several SLAs (Service Level Agreements) like the following:
SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.
Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?
Number of correct responses: 1