Question 76
When designing a backbone distribution system, you will need to include a telecommunications enclosure (TE). A TE can be defined as a:
Question 77
Where backbone cabling exceeds cabling lengths for the same performance or design (for product used in horizontal cabling), there are three fundamental tests which should be considered when testing. They are:
Question 78
You are preparing to test newly installed open office cabling. Within the open office cabling, there are multiple consolidation points (CP) that were installed while waiting for furniture. How do you proceed with permanent link testing?
Question 79
All entrance conduits should be equipped with a plastic or nylon line with a MINIMUM test rating of _________ pulling tension.
Question 80
In the ceiling zones method of ceiling distribution, divide the usable floor area into zones of how many square feet?
