Free EMC D-RP-DY-A-24 Exam Dumps Questions & Answers
| Exam Code/Number: | D-RP-DY-A-24Join the discussion |
| Exam Name: | Dell RecoverPoint Deploy Achievement |
| Certification: | EMC |
| Free Question Number: | 63 |
| Publish Date: | Jan 10, 2026 |
| # of views: | 1081 |
|
|
|
A company is deploying a physical RPA cluster to protect a Unity array. Which requirement must be verified prior to running the Deployment Manager, RecoverPoint with Unity Installer wizard?
What is the maximum number of arrays, per cluster, supported with a RecoverPoint/EX license?
During the write phase of RecoverPoint replication, when does the RPA send an acknowledgement back to the write splitter?
An organization plans to connect three different sites over IP using a RecoverPoint cluster at each site. However, the cluster fails to connect. The network team has determined that the required IP routing and WAN connectivity is in place. The desired routing information is added while running the Deployment Manager wizard.
What is a possible cause for the failure?
A storage administrator has seen high-load events in their RecoverPoint environment. The administrator wants to review the performance data for the past week with RecoverPoint. In addition, the administrator wants the raw data saved to a spreadsheet to review and create graphs of system performance over a period of time.
Which CLI command should be used?