Free EMC E20-895 Exam Dumps Questions & Answers
| Exam Code/Number: | E20-895Join the discussion |
| Exam Name: | Backup Recovery - Avamar Expert Exam for Implementation Engineers |
| Certification: | EMC |
| Free Question Number: | 260 |
| Publish Date: | Sep 07, 2026 |
| # of views: | 3402 |
|
|
|
An EMC Avamar customer has a SQL database that successfully completed a full backup. On the next night, a differential was cancelled due to scheduling concerns.
What should be considered for the next backup schedule?
An EMC Partner has a 1 X 4 Avamar server. They are backing up 4,000 desktop and laptop (DTLT) clients.
Each client takes up to 20 minutes to complete a backup.
How long would it take to back up all the DTLT clients?
You are implementing a Dell EMC Avamar solution for a Microsoft SQL Server 2012 AlwaysOn Availability Group. What is a consideration?
A backup administrator with an existing Avamar 7.0 single-node server wants to integrate a Data Domain appliance running DDOS 5.2 into their backup environment.
To provide disaster recovery of the Avamar server the administrator wants to store Avamar checkpoint backups on the new Data Domain system. When configuring the checkpoint backup, an error is displayed.
What is the possible cause?
A customer has an EMC Avamar system backing up a Celerra running DART 6.0 using a single 36 GB NDMP accelerator node. They are also going to back up a VNX OE 7.0 system using the same NDMP accelerator node.
Each NAS device has 6 GB RAM and four volumes configured on it. Backups will be configured on the Avamar system for both NAS storage devices to start at the same time.
What will occur when the NDMP backups start using default settings?