Question 61
A customer needs a single, dual-processor server for an Enterprise Resource Planning solution for a single office. The customer application uses a mix of HDDs and SSDs and up to 3TB of RAM.
Which HPE Solution should you propose?
Question 62
A customer has requested that you provide them with an architecture and bill-of-materials for a stack of top-ofrack switches. The customer has 34 HPE DL360 servers in the rack, each with four 1GBASE-T Ethernet ports which need to be connected to the network.
The customer is upgrading 50% of the 1GBASE-T Ethernet ports on the servers to 10GBASE-T Ethernet ports and needs the switching to support the upgraded servers. They are opposed to a chassis switch, and want to keep their number of managed devices on the network to a minimum.
Which architecture meets the customer requirements?
Question 63
Indicate whether each management feature manages or monitors a single system or multiple systems.
Question 64
A customer has two HPE ProLiant Gen10 servers. They both require firmware installation.
Which HPE tool should you recommend for performing this task?
Question 65
You plan to install an HPE ProLiant DL360 Gen10 in an environment with an ambient temperature of 45 C (113 F).
Which additional option is required?

