You are brought in to a customer with 1,115 employees to update the network and the previous network manager has left the company. What are methods to validate the current network state when the available network documentation is not up-to-date? (Choose two.)
Waratah Hospital, based in Australia, is planning to move many data center services to new facility. (The remaining legacy data center will not be part of this project.) Waratah Hospital hired an external consultant to assist with the new data center network design.
Based on the requirements for the data center network infrastructure, the external consultant has created a high-level design. The below summarizes the content of the design document.
Requirements and information:
- Six racks in the data center room (single row).
- Redundant Top of Rack leaf switches with back-to-front cooling in each rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
- Four 100 GbE uplinks per leaf switch.
- The customer requested to install all switch ports facing the back of the rack racks (hot aisle.)
- OOB management for servers, storage, and network has to be provided through an external switch with back-to-front cooling. This switch has to be included in the solution. One OOB switch provides connectivity for two racks.
- Core equipment for the OOBM network is being reused.
- Middle-of-row spine switches.
-The data center should connect to the hospital building with links that provide 400 Gbps.
- Internet access is provided through an existing firewall cluster with two firewalls, each firewall in one data room. The second firewall is operating in standby mode, VRRP is utilized on the firewalls for failover. The data center network should connect to these firewalls with links that total
100 Gbps.
- The external link is a dark fiber direct link based on single-mode fiber (OS2). The distance to the main hospital 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
- 99.999% uptime for this life-critical environment.
- Planned and unplanned downtime has to be minimized.
- Software upgrades are only allowed once per year with close to zero downtime.
- All life-critical resources are accessed locally, and all resources exist within the hospital campus.
- Waratah Hospital requires a highly secure environment for the data center. Encrypted wire speed connectivity between the data room and the hospital is a must-have because the link between the buildings crosses a public road.
- Waratah Hospital has a mix of virtualized (vSphere) servers. Nutanix storage, bare metal servers, backup servers and other devices.
In the past, the hospital has had a security breach that resulted in data loss, network downtime, and identity theft.
Waratah Hospital requires a high availability deployment of Aruba Fabric Composer. How many nodes are supported with the high availability option?
You are designing an L3 spine and leaf topology that uses CX switches. Those switches implement EVPN VXLAN. The customer does not require VRF segmentation for any of the data center endpoint traffic. What should you recommend for the VRF in which to place the SVIs for server, VM and other endpoint VLANs?
What is a key advantage of an active-active dual-homed server NIC design using VSX/MC-LAG at the access layer compared to active-standby NIC teaming?
You are designing an L3 spine and leaf architecture for a customer based on CX 10000 Series switches as leaf switches. The customer has added a requirEMENT that the leaf switches also support servers' iSCSI adapters. You have verified your design also meETS The customer's needs for lossless iSCSI. The customer asks for advice on ensuring that THE East-west firewall permits the iSCSI traffic. What should you explain?