Free HP HPE7-V01 Exam Dumps Questions & Answers
| Exam Code/Number: | HPE7-V01Join the discussion |
| Exam Name: | Advanced HPE Edge-to-Cloud Solutions Written Exam |
| Certification: | HP |
| Free Question Number: | 80 |
| Publish Date: | Sep 02, 2026 |
| # of views: | 1254 |
|
|
|
Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.
The customer requirements include:
30 compute nodes to support their virtualization workloads
Redundancy within the management subsystem
An in-frame storage solution to support vSAN
A guidance/automation technology with HPE Aruba to virtualize WWNs
Simplified management with a single logical enclosure
You are reviewing the following proposal:
3 x HPE Synergy 12000 frames
2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy
4 x HPE Synergy 50Gb Interconnect Link Modules
3 x HPE D3940 Storage Modules with maximum number of drives
6 x HPE Composer2 + 30 x HPE OneView Advanced licenses
30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate
mezzanine cards
Which statement about the proposal is true to help meet the customer requirements?
Your customer is considering HPE Alletra 6000 or HPE Alletra Storage MP B10000 for use as a Peer Persistence enabling platform for their critical workloads. Which statement about these platforms and their benefits is true for Peer Persistence?
Your customer's HPE Alletra 5000 deployment needs to support both iSCSI and Fibre Channel hosts simultaneously from the same array. What should you confirm during the design?
You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:
Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum
memory supported
Each node should have access to shared storage from HPE Alletra Storage MP B10000 All virtual machines should be protected against host failure All virtual machines with vGPU must be protected with Fault Tolerance All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1 All frames should be managed as one logical enclosure to simplify management All compute nodes should support two network ports with the maximum Ethernet connectivity speed You are reviewing a proposal that you must verify. The proposal consists of:
3 x HPE Synergy 12000 frames
2 x HPE Synergy Composer2 modules
4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy
4 x HPE Synergy 50Gb Interconnect Link Modules
3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives
1152 core VMware vSphere Enterprise Plus subscriptions
36 x HPE Synergy 480 Gen11 compute nodes
Each SY480 Gen11 is configured with:
A single Platinum CPU with 32 cores
HPE Synergy 6820C 25/50Gb Converged Network Adapter
HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter
HPE MR416i-o Gen11 12G SAS Mezzanine Controller
Which two statements are true regarding the proposal? (Select two.)
Your customer wants to implement a disaster recovery solution for their virtualization workload.
They also want to implement a protection method that will protect the workload in case of a site failure.
Their existing environment includes the following configurations:
All ESXi systems are located in the same datacenter
vSphere replication is deployed for VM DR
Some of the VMs are protected with Fault Tolerance
HPE Synergy 480 Gen11 is a compute platform
HPE Alletra Storage MP B10000 arrays for storage
Orchestrated failover for all VMs using VMware tools
The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.
Which component or configuration is a necessary part of a solution that will meet all customer requirements?
| HPE7-V01 Dumps Other Version | QA's | Publish Date |
| HP.HPE7-V01.v2026-05-18.q18 | 18 | May 18, 2026 |