Question 61
What is the terminal voltage of the battery in the open state?
Question 62
When installing the Huawei air-cooled air conditioner, the refrigerant pipeline positive pressure is required to be () hours.
Question 63
When four UPS2000G-20K parallel units are set and the number of redundant units in the parallel setting is set to "1", the capacity of the system is () KVA.
Question 64
What is the control component of the modular data center closed access door?
Question 65
When installing the UPS5000-E, there should be a certain distance between the back and the top to ensure ventilation and heat dissipation.
