Question 26
After the NetCol5000-A25kW half-cabinet air-conditioning refrigerant pipeline is installed, do the nitrogen charge pressure maintaining, the nitrogen pressure is () Mpa.
Question 27
When the device interface uses the Modbus-RTU protocol, what needs to be installed when accessing the ECC800?
Question 28
Which of the following options is a natural cooling system?
Question 29
Which of the following are the characteristics of Huawei NetCol5000-A row-level precision air conditioner cooling capacity adjustment?
Question 30
At present, the industry PUE value can be optimally achieved ( ).