Which of the following statements is true about the video site planning and design process?
Correct Answer: A
The correct answer is A because video site planning follows a logical engineering sequence: first determine where the site should be deployed, then perform a detailed site survey , and finally complete device selection planning based on the confirmed environmental and construction conditions. The material first lists typical site selection targets such as "Road intersections and entrances and exits" and "Key areas in cities" , which clearly corresponds to site selection planning. It then moves into survey items such as "Environment survey" , "Power supply" , and "Construction conditions" , showing that the survey is performed after the preliminary site location is determined and before final device planning is completed This sequence is consistent with actual project practice. A project team cannot choose appropriate poles, anti- corrosion levels, cameras, power schemes, or transmission methods until the physical environment has been checked. For example, the survey determines whether the site is near the sea, whether mains power is stable, and whether enough construction space is available. Those findings directly affect the final device model and solution design. Therefore, the correct process is video site selection planning # video site survey # video site device selection planning .
Question 32
If the solar photovoltaic module bracket is corroded and rusted, it can be replaced when the solar photovoltaic module is damaged.
Correct Answer: B
Question 33
For the routine inspection of CSP, which of the following parts are mainly included? (Multiple choice)
Correct Answer: A,B,C,D
Question 34
The characteristics of vehicles captured by the bayonet camera include (). (Multiple choice)
Correct Answer: A,B,C,D
Question 35
Huawei HoloSens IVS1800 stand-alone deployment network, what is the largest camera access scale?