Free IBM C2180-273 Exam Dumps Questions & Answers
| Exam Code/Number: | C2180-273Join the discussion |
| Exam Name: | IBM Business Process Manager Advanced V8.0 Integration Development |
| Certification: | IBM |
| Free Question Number: | 53 |
| Publish Date: | Jul 21, 2026 |
| # of views: | 1682 |
|
|
|
An integration developer needs to analyze a failed activity in an instance in Business Process Choreographer (BPC) Explorer. Exhibit 1 shows the process state for the failed activity.
Exhibit 1: The process stopped at CreditCheckService because the target service is not available. Because it was not possible to determine the cause of failure at the time, the integration developer decided to forcefully complete the failed activity by manually entering the output data. The integration developer clicks the CreditCheckService activity to see the menu option shown in Exhibit 2.
Exhibit 2:
Which option should the integration developer select to resume and complete the failed activity? Jump to Another Activity to go to another activity, click the next activity as a target activity:
A client requires that a new BPEL process return a fault message to the requester in case the process does not complete correctly. The integration developer has added a fault handler to the process to catch all exceptions. How should the integration developer return the fault message?
An application receives a batch of order records that are needed to populate a database. An order record is received that will cause an insert into the database table. Subsequent records will update this record. It is important that the: ?insert record is processed first. ?updates are processed so that the order record has the correct information at the end of processing. ?If update 1 changes the quantity from 5 to 20. ?If update 2 changes the quantity from 20 to 11. ?If update 2 is processed before update 1, the order quantity will no longer be correct. Which of the following quality of service (QoS) qualifiers should the integration developer use?
An integration developer needs to design a Web Services Description Language (WSDL) interface containing an operation that has an input of type Client. An existing WSDL file containing the Client data type has been imported into a library using IBM Integration Designer. The Client type cannot be used in the interface editor, although it is in the project data folder and shown by the Business Object Editor. Which option states why the integration developer sees this behavior?
The integration developer needs to enable the Common Event Infrastructure (CEI) on a business process, such that the CEI events are generated only when the business process has completed successfully. Which of the following transaction behavior must the integration developer choose to set on the business process activity? Set a transmission mode of: