Free ISQI CTAL-TAE Exam Dumps Questions & Answers
| Exam Code/Number: | CTAL-TAEJoin the discussion |
| Exam Name: | ISTQB Certified Tester Advanced Level, Test Automation Engineering |
| Certification: | ISQI |
| Free Question Number: | 41 |
| Publish Date: | Jan 15, 2026 |
| # of views: | 3775 |
|
|
|
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?
A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?
You are currently designing the TAA of a TAS. You have been asked to adopt an approach forautomatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardwareand communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the testenvironment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifyingthe values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?
Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUTenvironment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?
| CTAL-TAE Dumps Other Version | QA's | Publish Date |
| ISQI.CTAL-TAE.v2023-06-24.q21 | 21 | Jun 24, 2023 |
| ISQI.CTAL-TAE.v2023-03-30.q20 | 20 | Mar 30, 2023 |
| ISQI.CTAL-TAE.v2022-08-01.q20 | 20 | Aug 01, 2022 |
| ISQI.CTAL-TAE.v2022-04-05.q23 | 23 | Apr 05, 2022 |