Free ISQI CTAL-TA_Syll2012 Exam Dumps Questions & Answers
| Exam Code/Number: | CTAL-TA_Syll2012Join the discussion |
| Exam Name: | ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012) |
| Certification: | ISQI |
| Free Question Number: | 60 |
| Publish Date: | Aug 19, 2026 |
| # of views: | 2640 |
|
|
|
In an organization using keyword-driven automation, which of the following activities typically is the responsibility of the test analyst?
[K2] 1 credit
Your test team is currently executing interoperability testing. Consider the following excerpt from the failure description of an interoperability defect report:
1.Connect external camera to a Windows Vista PC.
2.Start the camera application on the PC. Application starts normally and recognizes connected camera.
3.Attempt to download the recorded data from the camera.
4.Data does not download.
5.Attempt to download the data three times. Data will not down-load.
Based on this information alone, which of the problems described hereafter exists in this defect report?
[K4] 3 credits
A temperature unit holds the temperature between 10 degrees Celcius and -10 degrees Celcius. If the temperature drops below -10 or rises above 10 then an alarm rings. Boundary Value Analysis tests are drawn up using the approach of two test cases per boundary. The temperatures to be tested are:
[K3] 2 credits
Working together with the test manager during test planning, which of the following activities is NOT expected to be performed by the test analyst?
[K2] 1 credit