Question 101
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?
Question 102
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary data. You need to update the effective labor costs for all labor groups.
Which element must be updated?
Question 103
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
Question 104
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Question 105
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:
* The setup uses a Lean schedule group with a throughput ratio = 2.
* The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.
* The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).
* The throughput is 10 per hour.
You need to set up a Discrete operation to mirror the item's production flow activity.