Question 21
When environmental enclosures are being used an inspector needs to be concerned about:
Question 22
When observing design defects the NACE Inspector should:
Question 23
As a NACE Level 2 Inspector on a field job; prior to submission your documentation should always reviewed and approved by:
Question 24
You are the NACY Coating Inspector on a tank lining project where desiccant dehumidification is being used. Since the first shift of abrasive blasting your readings have indicated relative humidity below 40%; however on the second shift of coating application your readings are indicting 80%.
Your FIRST preferred course of action is to:
Question 25
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should: