Free Network Appliance NS0-181 Exam Dumps Questions & Answers
| Exam Code/Number: | NS0-181Join the discussion |
| Exam Name: | NetApp Certified Storage Installation Engineer - ONTAP 9.1 |
| Certification: | Network Appliance |
| Free Question Number: | 85 |
| Publish Date: | Aug 17, 2026 |
| # of views: | 2820 |
|
|
|
You have just replaced a FAS controller with a new controller and installed the appropriate licenses for the new FAS controller.
What are two ways to remove unused licenses in this situation? (Choose two.)
Select the Exhibit tab.
Your customer has an AFF A300 installed. They ask you to configure the e0a and e0b ports to use the FC protocol.
Referring to the exhibit, which statement is correct in this scenario?
Without adding new cluster interconnect switches, you want to nondisruptively upgrade from FAS2554 controllers to FAS8200 controllers on an existing 2-node switchless cluster running ONTAP 9.1 software.
Which statement is correct in this scenario?
After completing an installation, the customer wants to know how they can manually open a new technical case with NetApp Global Support.
What are three ways to accomplish this task? (Choose three.)
Your customer has filled out the customer installation worksheet. However, the customer's network environment is not set up and ready for the new ONTAP 9.1 system. The customer requests that you install the system and states that they will finish the configuration when they have acquired the appropriate network connections.
Which two statements are correct about this scenario? (Choose two.)