Question 61
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)
Question 62
An SE needs to size a new project that requires offsite backup but not remote disaster recovery. The prospect requires an RTO of 48 hours, RPO of 4 hours, and the ability to restore from the past 5days of backups. The prospect's data change rate is 1%.

How should the SE configure Sizer for this scenario?
Question 63
When sizing for Splunk, the customer states the daily ingest rate is 500GB and they are currently using Search Factor 2 and Splunk Replication Factor 2.
Which two additional input are required by Sizer? (Choose two)
Question 64
Which three cluster operations require an administrator to reclaim licenses?(Choose three)
Question 65
Based on their current workload. a customer request the systems engineer to create a solution that does not exceed 80% CPU utilization when a node is placed in maintenance mode (N+0) When creating the Sizer Scenario in Automatic Mode, how can the systems engineer accomplish this?
