Free Nutanix NCSE-Level-1 Exam Dumps Questions & Answers
| Exam Code/Number: | NCSE-Level-1Join the discussion |
| Exam Name: | Nutanix Certified Systems Engineer (NCSE): Level 1 |
| Certification: | Nutanix |
| Free Question Number: | 85 |
| Publish Date: | Oct 04, 2026 |
| # of views: | 4105 |
|
|
|
Refer to Exhibit.
When entering a Raw Input workload into Sizer, what amount of RAM should be used for the entire workload?
An SE is meeting with a prospect that is refreshing infrastructure in 100 retail locations. Currently the stores use vSphere hosts connected to direct attached storage and are managed by 6 separate vCenter servers. On-site retail staff is unqualified to deal with any hardware break/fix issues.
Which two aspects of Nutanix solution should the SE highlight? (Choose two)
During a sales motion with a new prospect, the prospect asks to do a POC so they can experience Nutanix in their environment.
What is the most important item the SE must have in place with the prospect before moving forward with a POC?
A customer is asking for a quote for a hybrid cluster to run general purpose VMs and an ERP application containing a 500GB database. The customer has a VSAN ReadyNode quote already and looking for a comparable Nutanix solution. They share the following specifications
3 hosts
2 x E5-2640v4 CPU
512GB RAM
1 x 480GB SSD
2 x 8TB HDD
2 x 1GB NIC
Which two aspects of the requested configuration should cause concern and need for further discovery?
(Choose two.)
An SE needs to size a new project that requires offsite backup but not remote disaster recovery. The prospect requires an RTO of 48 hours, RPO of 4 hours, and the ability to restore from the past 5days of backups. The prospect's data change rate is 1%.

How should the SE configure Sizer for this scenario?
| NCSE-Level-1 Dumps Other Version | QA's | Publish Date |
| Nutanix.NCSE-Level-1.v2022-01-17.q26 | 26 | Jan 17, 2022 |