An internal auditor of a manufacturer of polystyrene packaging products for the electronics industry raised a nonconformity against section 10.3 of ISO 9001 in Report IA202. The nonconformity (NC 3) stated:
" The reject rate of the finished product of 9.7% needs improvement as it doesn ' t meet the stated objective of top management of 5%. " As the third-party auditor reviewing the internal audit process, you come across the nonconformity. For corrective action, the Quality Manager conducted an investigation into the reject rates. He reported that the collection baskets for products ejecting from the moulding machines were not large enough. About 6% of products fell onto the wet and dirty factory floor. Management stated that replacing the baskets was too costly and ordered the Maintenance Manager to ensure that the floor was kept clean and dry to prevent rejects. The auditor later checked the factory floor, which was wet and dirty in places.
From the following nonconformities, select three that the auditor could raise to ISO 9001.
(In the context of a second-party quality management system audit , select the two correct statements from the following:)
You have been just hired as the Internal Lead Auditor of a large organisation, responsible for internal audits.
Your first job is to analyse the answers to nonconformities included in the report of a recent internal audit to Top Management.
The report contained one nonconformity as follows:
There is no evidence of Top Management ensuring the availability of resources to operate the QMS, the establishment of objectives, the promotion of continual improvement, and the promoting of the process approach.
Which four of the following Top Management actions can be considered ' corrections to the nonconformity ' ?
You are conducting an ISO 9001 audit of a Materials Recycling Facility. The organisation processes waste plastics into raw materials for plastic bottle manufacturers. You reach the manual picking line where operators are removing contaminant materials from incoming products, such as plastic bags, plastic film and badly contaminated items that would compromise the recycling process. You interview the line supervisor.
You: " Why are these plastic items being rejected at this stage? "
Auditee: " They do not meet our processing standards. "
You: " What is the reason for that? "
Auditee: " These items are likely to damage the machinery down the line. They can also compromise our quality standards. We need to protect our reputation for good quality output materials. " You: " What happens to the rejected items? " Auditee: " Some get melted down in another process later on, and some are disposed of as waste products that cannot be recycled. " You: " What happens to the waste products? " Auditee: " I ' m not sure. I suppose they go to landfill. " After further auditing, you have gathered additional evidence. Match the following statements to the correct ISO 9001 standard clause shown.
To complete the table, click on the blank section you want to complete so that it is highlighted in red, and then click on the applicable text from the options below.
Alternatively, drag and drop each option to the appropriate blank section.
The certification body has not been able to verify the implementation of corrective actions for any identified major nonconformity within six months after the last day of the Stage 2 audit. What must the certification body do in this case?