Free SAP C_DBADM Exam Dumps Questions & Answers
| Exam Code/Number: | C_DBADMJoin the discussion |
| Exam Name: | SAP Certified - Database Administrator - SAP HANA |
| Certification: | SAP |
| Free Question Number: | 216 |
| Publish Date: | Jul 19, 2026 |
| # of views: | 185 |
|
|
|
<strong>CHALLENGE 1 — First Close Configuration Traceability</strong> During first close rehearsal, claims analytics reports load successfully from the upgraded SAP HANA system. The final administration record does not show whether the post-upgrade configuration adjustment was active during the rehearsal. What should the administrator do before accepting the close reporting evidence?
A precision equipment manufacturer is moving selected database workloads from on-premises SAP HANA to SAP HANA Cloud in controlled phases. The next transition wave is technically ready, but the administration team finds that the target cloud environment has been prepared while the operational acceptance criteria are still written only for the on-premises model.
As a result, the migration checklist confirms technical completion but gives no clear decision point for cloud-side monitoring and support readiness. Management wants the transition wave to proceed this month, but it also wants to avoid repeating a pattern where migrated workloads immediately require corrective operational follow-up.
What is the best action before closing the next transition wave?
<strong>CHALLENGE 1 — Hypercare Configuration Record Traceability</strong> The hypercare coordinator wants to accept the comparison because meter-reading exception dashboards opened successfully. The database team later confirms that the upgraded service reporting system’s administration record does not reflect the configuration state used during testing. Which decision best supports readiness-quality evidence?
<strong>CHALLENGE 4 — Close Recovery Readiness Gate</strong>
The sponsor asks whether the first close package can be approved now because backups completed and reports loaded successfully. The administration lead can either approve now or delay briefly to complete recovery evidence for the systems in scope. Which path is most defensible?
A regional home services company uses SAP HANA for technician assignment analytics in an on-premises administration environment. After a controlled start activity, SAP HANA cockpit shows the database as available, and business users can open dashboards. During operational validation, the administrator sees that one administration parameter is active for the system database context but not for the tenant context used by the scheduled reporting workload. The change record lists the parameter as completed.
The constraint is that the administrator must confirm the configuration in the context where execution occurs. The team must not approve the activity based only on a completed change record or system-level visibility.
Which action best resolves the configuration validation gap?