Free SAP C_DBADM_2601 Exam Dumps Questions & Answers
| Exam Code/Number: | C_DBADM_2601Join the discussion |
| Exam Name: | SAP Certified - Database Administrator - SAP HANA |
| Certification: | SAP |
| Free Question Number: | 217 |
| Publish Date: | Sep 04, 2026 |
| # of views: | 749 |
|
|
|
CHALLENGE 4 - Shipping-Cycle Recovery Evidence Gate
Backups completed for the upgraded distribution reporting system and the installed validation database before testing began. Recovery validation for the validation database is scheduled but not complete, and the upgraded system has only backup completion evidence. What should happen before final cutover approval supports release use?
A regional publishing group is preparing an SAP HANA administration runbook for a mixed landscape that includes an on-premises database and an SAP HANA Cloud environment. The draft runbook uses one lifecycle calendar for both environments. During review, the administrator notices that the calendar combines an on-premises upgrade window, SAP HANA Cloud availability checks, and migration rehearsal milestones into one approval step. SAP HANA cockpit confirms the on-premises database is available, and SAP HANA Cloud Central confirms the cloud environment is running.
The constraint is that the runbook must support correct operational decisions for each environment without treating mixed lifecycle evidence as one shared approval state.
Which action best improves the runbook before operational use?
CHALLENGE 4 - Release Recoverability Evidence Gate
The upgraded reporting system has recent backup completion evidence but no current recovery validation record. The newly installed UAT database has a recovery test scheduled before sign-off. Which interpretation is most accurate?
A regional commercial cleaning company uses SAP HANA for workforce allocation analytics in an on-premises environment. After planned maintenance, SAP HANA cockpit shows the database as available, and users can refresh dashboards. During validation, the administrator finds that the post-start checklist was completed from an administrator workspace that still points to the previous maintenance profile. The active operations profile used by the scheduled administration cycle has not been validated after startup.
The constraint is that the administrator must prove the active operations profile is ready for scheduled administration. The activity cannot be closed based on evidence from a workspace that is no longer the operational reference.
Which action best resolves the post-start validation issue?
CHALLENGE 1 - Recovery Review Configuration Traceability
During recovery readiness review, scheduling test users can open appointment backlog reports from both SAP HANA systems. The newly installed validation database has its active configuration documented, but the upgraded reporting system has one post-upgrade value recorded only in a maintenance handover log. What should the administrator do before accepting the readiness comparison?