Question 6
Refer to the exhibit.
Exhibit: A49.01114316-102
The architect has determined that this building requires two 10GPE links to the data center.
What is the correct transceiver type for the links?
Question 7
Refer to the exhibit.
A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?
Question 8
Refer to the exhibit.
A customer has the wined infrastructure shown in the exhibit. The customer is in the process of expanding their wireless services They will now add a new wireless solution, with mobility controllers (MCs) connected as shown. The new wireless solution will support a total of 450 APs and about 26,000 wireless devices. It must provide seamless roaming across the entire campus.
After the new deployment, both wired and wireless devices experience IP connectivity issues.
Which change to the existing infrastructure should the architect recommend to support all of the customer requirements?
Question 9
What is one reason to deploy an Aruba CX switch when compared to an ArubaOS switch?
Question 10
Refer to the exhibit.
A customer has these availability requirements;
* loss of one controller with stateful failover and without impact on wireless client connectivity
* loss of one core switch without loss of connectivity for any endpoints or APs in the building
* loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the building and with minimal impact on infrastructure functionality
* loss of any one access switch with minimal impact to wireless client connectivity The exhibit shows the current plan for the topology.
Which change should the architect make to the plan to provide better support for the customers availability requirements?
