Question 11
As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in
* different environments?
* Does the test automation tool support a licensing scheme that allows accessing different sets?
* Does the testautomation tool have a large feature set, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?
Question 12
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of thesuite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?
Question 13
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allowschecking a webpage load everyseconds until a timeout value
Question 14
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?
Question 15
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the testenvironment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifyingthe values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?