Latest LEED-AP-BD-C Exam Premium Dumps provide by TrainingQuiz.com to help you Passing LEED-AP-BD-C Exam! TrainingQuiz.com offers the updated LEED-AP-BD-C exam dumps, the TrainingQuiz.com LEED-AP-BD-C exam questions has been updated to correct Answer. Get the latest TrainingQuiz.com LEED-AP-BD-C pdf dumps with Exam Engine here:
(407 Q&As Dumps, 40%OFF Special Discount: DumpsDB)
Question 271
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?
Question 272
Which of the following is required when documenting a LEED Pilot credit?
Question 273
A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?
Question 274
The total land area within a 1/4 mi. (0.40 km) radius of a project boundary consists of 130 acres (53 hectares) and has a residential to nonresidential ratio of 60:40. Within this same total land area, there are 780 dwelling units and 1,600,000 ft2 (148 645 m2) of nonresidential building space. Given these parameters, what are the surrounding residential and nonresidential densities when attempting to achieve Location and Transportation Credit, Surrounding Density and Diverse Uses?
Question 275
Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?