Question 11
Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?
Question 12
Which of the following documents is most likely to be of the LEAST value to a planner/scheduler when planning a contractor's baseline critical path schedule for the construction of a large high-clearance bridge located very near an airport? The contractor has been awarded the contract.
Question 13
Which of the following will always describe the critical path? The path with
Question 14
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?
Question 15
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?