Question 81
A prospects need to refresh their environment but has a very small budget for the project. Four years after their last infrastructure refresh, the prospect's datacenter is only running at 40% utilization. In addition, they have
25 satellite offices. Each office has a requirement to run 4 to 6 VM's locally.
Which two Nutanix platform capabilities should the SE highlight to address the prospect's concerns? (Choose two)
Question 82
A prospect customer's expected workload consists of the following: 110 vCPU 512GB RAM * 500TB Storage They need a solution to help decrease storage costs. The majority of their storage requirements come from an imaging application that stores scanned JPEG images. Which two Nutanix capabilities should be leveraged?
(Choose two.)
Question 83
A VOI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (BridgeO). An administrator need to verify if nodes are using all network card associated to BridgeO.
Which two menus should be used to check the current configuration? (Choose two.)
Question 84
Which tool could be used to perform a sizing discovery in a general server virtualization environment running both VMware ESXi and Nutanix AHV?
Question 85
A customer previously purchased a Nutanix solution of nine NX-3060 G7 nodes. The customer asks for help to increase the resillency of their environment after power outages to individual racks in their datacenter.
Their current soluction consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack.
What should the systems engineer recommend to this customer?