Question 66
What is the MINIMUM lighting requirement for telecommunications spaces?
Question 67
The risk manager completes risk response planning. The risk manager believes that to effectively address all eventualities, an additional action is required.
What should the program manager do next?
Question 68
An ICT distribution designer is representing a client during a project execution.
What is the designer's role in the Vendor and Contractor Coordination?
Question 69
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
Question 70
Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the siding of the exterior. For these reasons, telecommunications cabling shall be acceptance tested. Acceptance testing includes visual examination and verification of all cabling and qualification of copper cabling for data cabling or certification of copper or optical fiber cabling for data cabling.
Verification testing is generally performed in which two of the following steps? (Choose two.)