Question 46
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?
Question 47
A commercial office building floor has a usable floor space of 1858 m2 (20,000 ft2).
What is the MINIMUM number of 103 mm (4 trade size) conduits that shall be required to interconnect the telecommunications rooms on this floor?
Question 48
A small regional utility closes a customer rewards program and transitions it to operations. The executive sponsor and program manager are concerned about the impact on benefits realization. The program manager assures the executive sponsor that any corrective actions will be included in the next phase.
What should the program manager do to ensure a successful transition?
Question 49
The project managers for component projects A and B schedule the same resource to perform tasks during the same timeframe, resulting in an over-allocation. The program manager reviews the program resource management plan determine that project. A can wait until the resource becomes available, and assigns the resource to project B.
This is an example of which of the following?
Question 50
What should be considered when designing a fiber network?